Packaging Supply Models for Manufacturers: Call-Off from Supplier Stock, Consignment, Kanban and Ordering from Your ERP

Manufacturers buy corrugated boxes in six main ways: one-off orders, batches for their own stock, call-off from stock held by the supplier, consignment stock at their own site, kanban replenishment on a signal, and framework agreements with reserved capacity. The right model depends on how regular your use is, how much space and cash you can tie up, how often the specification changes and who carries the risk of unused stock. This guide compares the models and lists what to agree. As of 18 November 2026.

Six supply models compared

Model How it works Where the stock sits How it is invoiced Best for
One-off order You order when you need boxes; the supplier produces and delivers Only the delivered quantity, at your site Per order Irregular items, launches, trials
Own stock You order larger batches and store them Your warehouse, your property Per delivery Steady use, enough space
Call-off from supplier stock The supplier produces a batch, holds it and delivers parts on call-off The supplier’s warehouse; ownership and payment as in the contract Per delivery or for the whole batch Steady sizes, little space
Consignment stock The supplier keeps stock at your site; you take what you need Your site; the supplier’s property until you take it On usage, from withdrawal reports Large, regular volumes of a few sizes
Kanban An empty pallet, bin or card triggers a fixed replenishment quantity A small loop of stock at your site Per delivery Very regular use, packing lines
Framework agreement with capacity reservation A forecast plus capacity reserved for a period or season As in the delivery model chosen As in the delivery model; a binding contract can also fix the price Seasonal peaks, launches

The models can be combined, for example own stock of the two fastest sizes, call-off for the regular ones and kanban for one packing line.

Who carries the stock risk

Boxes in your size and print have no other buyer. Call-off and consignment save space and defer payment, but the commitment to take the batch normally stays with you. Before the first batch, check how long the supplier holds stock for you, who pays for leftovers when the size or print changes, and what happens to the remainder when the holding period ends. Long storage also costs quality (see how to store corrugated boxes).

Reorder point and batch size

  • Reorder point = weekly use × lead time in weeks + safety stock.
  • Safety stock covers changes in use and lead time; set it in weeks of use and adjust it from experience.
  • Batch size = weekly use × weeks one delivery should cover, rounded up to full pallets.

Illustration, not an offer: with 1200 boxes a week, a lead time of 2 weeks and 1 week of safety stock, the reorder point is 3600 boxes; a batch for 6 weeks is 7200 boxes. Use the lead time you can count on, not the best case, and add transport time for deliveries from another country. Pallet and truck counts are explained in ordering boxes by the pallet.

Call-off from supplier stock: what to agree

  • Quantities: the batch produced at once and the smallest call-off, for example one pallet.
  • Holding period and what happens to the remainder at its end.
  • Storage: charges and storage conditions.
  • Lead time per call-off and how you place it: e-mail, portal or an order from your system.
  • Invoicing: per delivery or for the whole batch.
  • Marking: a batch number or production date on every pallet, so the oldest stock goes first.

See also our page on just-in-time delivery and call-off production and, for resellers, JIT or your own stock.

Consignment stock at your site

The boxes stand in your warehouse but remain the supplier’s property until you take them. You report withdrawals, for example monthly, and the supplier invoices what you used. You need a separate, marked area, regular stock counts and clear rules on insurance, liability for damage and slow-moving stock.

Across borders there is a VAT side. Where a supplier moves its goods to a stock in another EU country for a known customer who takes ownership on withdrawal, EU law provides a simplification for call-off stock arrangements (Article 17a of Directive 2006/112/EC). Its conditions include the customer’s VAT number known at dispatch, registers kept by both parties and a 12-month limit for taking the goods. Directive (EU) 2025/516 phases it out: it covers only goods dispatched on or before 30 June 2028, and Article 17a ceases to apply on 30 June 2029. Note the double meaning: in logistics, “call-off” means deliveries from the supplier’s stock; in VAT law, “call-off stock” is stock in the customer’s country. General information, not tax advice.

Kanban for packaging

Toyota describes just-in-time as making only what is needed, when it is needed and in the quantity needed, with kanban at its centre to replenish the line side and keep stock low. The Lean Enterprise Institute defines a kanban as a signalling device that authorises production or withdrawal, supplier kanban included. For boxes this means a fixed loop: a set number of pallets or bins per size, a fixed quantity per signal and a fixed replenishment time.

The loop must cover use during the replenishment time plus a reserve. Illustration, not an offer: 3 pallets used per week, 1 week of replenishment time and a reserve of 1 pallet give a loop of 4 pallets; each emptied pallet sends one signal. Kanban suits sizes used daily in similar quantities, not seasonal items.

Ordering from your ERP or purchasing system

  • One item number per specification, with the supplier’s article number and specification version.
  • An order channel: a PDF purchase order by e-mail, a supplier portal or a direct connection (EDI or API).
  • An order confirmation with a delivery date for each line.
  • Delivery notes and pallet labels with your order and item numbers, so goods receipt books them without retyping.
  • Invoices with the same numbers, per delivery or as a summary invoice.

EU VAT rules oblige member states to allow summary invoices listing several separate supplies, provided VAT on them becomes chargeable in the same calendar month (Article 223 of Directive 2006/112/EC, as of 18 November 2026).

Checklist for the supply agreement

  • Items covered, each with its specification version and supply model.
  • Batch size, smallest call-off and holding period.
  • Who pays for unused stock after a change of size or print.
  • Lead time for orders, call-offs and urgent orders.
  • Order channel and the numbers every document carries.
  • Invoicing: per delivery, per batch, on usage or summary invoice.
  • How often the forecast is shared and which part is binding; capacity reserved for the season.
  • Tolerances, batch marking, complaints, and a second source for critical sizes (see when dual sourcing makes sense).

How we work with manufacturers at Kartoniki.eu

We are a corrugated packaging manufacturer in Lubartów, Poland, on the market since 2019; the people we employ have 20 years of experience in the packaging industry.

  • Call-off: we hold a batch at our plant and deliver it on call-off, invoiced per delivery or for the whole batch; storage terms are set in the contract.
  • Consignment: for larger regular customers, stock at your site settled on usage, on contract terms.
  • Ordering: we can integrate with your purchasing system by reading PDF orders or via API, and provide a panel for ordering and managing stock if you need one; summary invoices by agreement.
  • Capacity: reservation for your season; with a binding contract a price guarantee is possible.
  • Second source: selected items or part of the volume, with no threshold, also as a reserve stock.
  • Lead time: most orders are delivered within 7 days (max. 16 working days); an urgent order from a regular customer enters the production plan within 1–2 working days. Selected orders can be made within 24 hours of confirmation from our standing stock of board sheets, at an extra charge confirmed in the quote.
  • Flexibility: quantity, date and size can be changed free of charge until production starts, except board and printing plates already ordered. No annual volume commitment, no minimum take-up, no penalties for smaller orders.
  • Contact: one person approves price, lead time and non-standard terms, usually on the day of the enquiry; you have a direct phone line to the person handling your order, who knows production.

We buy board sheets continuously from at least two independent board producers. We tailor order quantities to your needs – we also make short runs and prototypes. If a construction requires a minimum quantity, we state it in the quote. Delivery abroad is possible – we quote transport separately, on request. It pays off for larger orders. The first order is usually paid in advance; payment terms for regular customers are agreed individually.

Sources

Toyota Europe, Toyota Production System; Lean Enterprise Institute, Kanban; NC State University, Safety Stock Analysis; Directive 2006/112/EC, Articles 17a, 223 and 243; Directive (EU) 2025/516, Article 2; European Commission, Explanatory Notes on the 2020 Quick Fixes. Checked on 18 November 2026.

What to send us

List your items, monthly use per item, storage space and how you order today. We will propose a supply model per item and quote within a few hours on working days. Write to us through our home page. To compare offers on full cost, see total cost of ownership; to cut the number of sizes, see fewer box sizes.

Frequently asked questions

What is a call-off agreement for packaging?

The supplier produces a batch of your boxes, holds it and delivers parts of it when you call them off. You get the consistency of one production run without storing the whole batch. The batch size, holding period, invoicing and what happens to the remainder are set in the contract.

What is the difference between call-off and consignment stock?

With call-off, the stock stays at the supplier and reaches you in deliveries. With consignment, the stock is already at your site but remains the supplier’s property until you take it, and you pay for what you use, based on withdrawal reports.

Does kanban work for corrugated boxes?

Yes, for sizes with regular use, such as boxes for a packing line. A fixed number of pallets or bins circulates; when one is emptied, the signal triggers a fixed replenishment quantity. The loop must cover use during the replenishment time plus a reserve.

How do I calculate the reorder point for boxes?

Reorder point = weekly use × lead time in weeks + safety stock. Illustration, not an offer: 1200 boxes a week, 2 weeks of lead time and 1 week of safety stock give a reorder point of 3600 boxes.

Who pays for boxes left in stock when the design changes?

That is set in the contract. Boxes in your size and print cannot be sold to anyone else, so agree before the first batch how long the supplier holds the stock and who takes the remainder after a change.

Can consignment stock be in another EU country?

It can, but it has VAT consequences. EU law has a simplification for call-off stock arrangements (Article 17a of Directive 2006/112/EC) with conditions and a 12-month limit, and Directive (EU) 2025/516 limits it to goods dispatched on or before 30 June 2028. General information, not tax advice.

Can you take orders from our ERP system?

Yes. We can integrate with your purchasing system by reading PDF orders or via API, and if you need it we can provide a panel for ordering and managing your stock. A summary invoice for several deliveries is possible by agreement.

Do you hold our boxes and deliver them on call-off?

Yes, for regular customers. We produce a batch, hold it at our plant and deliver it on call-off. We invoice per delivery or for the whole batch, and the storage terms are set in the contract. Delivery abroad is possible – we quote transport separately, on request. It pays off for larger orders.