Packaging for Agricultural Machinery Parts: Cartons, Inserts and Board for Shafts, Blades, Hydraulics and Large Assemblies
Agricultural machinery parts are packed by shape and weight: long shafts and axles in tube-type or telescopic cartons, knives and ploughshares in cartons with inserts and edge protection, filters, seals and small parts in cartons with dividers, hydraulic components in cartons with cut-out inserts, loose parts in pallet boxes or octabins, and large assemblies in XXL cartons of up to 10 × 3 m. The board, usually 5-layer or 7-layer for heavy parts, follows from the weight, the size and the route. We make all of these to order at our plant in Lubartów, Poland. Status 13 November 2026.
Typical parts and what goes wrong in transport
Production and spare parts for tractors, harvesters, tillage and sowing equipment combine weight, length, sharp edges and machined surfaces. Damage in transit usually has one of these causes:
- Weight on a small area. A dense steel part loads the bottom and the joint of the carton, above all when the pack is lifted, dropped or pushed on a pallet.
- Length. Shafts, axles and tines bend a carton that is too weak along its length, or slide and push through the end flaps.
- Sharp edges and points. Knives, ploughshares and tines can cut through a wall if they are not held away from it.
- Machined surfaces and threads. Seats, splines, threads and hydraulic ports are damaged by knocks and by parts rubbing against each other.
- Moisture. Corrugated board loses compression strength as it takes up moisture, and the board itself gives no protection against corrosion.
- Oil and grease. Parts shipped oiled or greased can soak the board, so a film bag or liner between the part and the carton is often needed.
Which packaging for which part
These are typical starting points. The final construction depends on the part, the quantity per pack and the route.
| Part | Packaging | Board | What it solves |
|---|---|---|---|
| Shafts, axles, tines, long profiles | Tube-type carton (long and rectangular) up to 240 cm inside length; telescopic carton for longer parts | 5-layer or 7-layer | Guiding inserts hold the part in the centre and stop it sliding into the ends; see tube-style and telescopic cartons for long items |
| Knives, blades, ploughshares | Carton with inserts and corner or edge protection | Heavy 5-layer AC or 7-layer AAC | Sharp edges do not press on the walls; parts do not touch each other |
| Filters, seals, small parts | Slotted carton with dividers, labelled on the outside | 3-layer or 5-layer | One compartment per part, so pieces do not rub or mix |
| Hydraulic components | Carton or corrugated crate with cut-out inserts | 5-layer or 7-layer | Fittings and threads are held clear of the walls; a film bag or liner if parts may carry oil |
| Loose parts in bulk | Pallet box or octabin | Chosen for the load | Many small parts in one unit load for the warehouse or the assembly line |
| Large assemblies | XXL carton up to 10 × 3 m, stitched or glued, on a pallet or skid | 5-layer or 7-layer | One pack for the whole assembly; see oversized (XXL) corrugated boxes |
For assemblies that stand on a pallet or a skid, a telescopic carton lets the cover be lowered over the part instead of the part being lifted into a box. Die-cut constructions, for example inserts cut together with the blank, are possible up to 260 × 150 cm.
Choosing the board
We choose the board with you from the weight and size of the part and the way it travels:
- Light parts: 3-layer board (E, B or C flute) or 5-layer board.
- Medium parts: 5-layer board (EB, BE or BC) or 7-layer board.
- Heavy or long parts: heavy 5-layer AC board or 7-layer AAC board; special compositions are possible, with paper grades and flutes chosen for the strength required.
The manufacturer’s joint is glued at several points or stitched with metal staples, depending on the load. Board parameters such as ECT come from our board suppliers’ tests for each batch. We do not quote load capacity in kilograms: it is set for your part once we know its weight and dimensions, and checked on a prototype. For heavy board in detail see heavy-duty cartons in AC and AAC board.
Inserts, dividers and edge protection
- Cut-out inserts follow the outline of the part, hold it in place and keep it away from the walls.
- Dividers and lattice dividers separate small parts, one part per compartment.
- Corner and edge protectors from board take the load of sharp edges and protect the corners of heavy packs.
- Layer pads separate layers of cartons or parts on a pallet.
- Fillers from board strips, honeycomb or rolled board are made on request; foam inserts are supplied in cooperation with partners.
Dividers, lattices, inserts and fillers are made to your dimensions.
Corrosion and moisture
Corrugated board does not protect steel against corrosion. For bare or machined steel parts that are stored or travel for a long time, ask your corrosion-protection supplier about VCI (volatile corrosion inhibitor) film or paper or other measures. VCI products release an inhibitor into the air space of a closed pack, and their makers ask for clean, dry parts and a closed pack. The right choice depends on the metal, the storage time and the conditions. A film bag or liner made by a partner can be supplied together with the carton. For humid storage, cold and sea freight see corrugated packaging for humidity, cold, corrosion and sensitive loads.
Marking and labels
Part number, name, code and handling pictograms can be printed on the carton. On heavy or long packs, symbols such as centre of gravity and this way up tell handlers how to lift and place the pack; they are defined in ISO 780, see handling marks on cartons. ISO 780 itself notes that symbols do not guarantee proper handling: protective packaging comes first. We print flexographically and digitally, including UV, and digital printing can add variable data such as a different part number or code to each carton.
Export and the PPWR
For exports outside the EU, check the requirements of the destination country. Wooden skids, pallets and crates in international trade fall under ISPM 15 (see ISPM 15 for wood packaging), and for choosing cartons, pallets and pallet boxes for cross-border loads see corrugated export packaging.
Under Regulation (EU) 2025/40 (PPWR), the re-use targets for transport packaging that start on 1 January 2030 do not apply to cardboard boxes (Article 29(4)(d)), which the Commission’s FAQ says includes corrugated boxes, nor to packaging custom-designed for transporting large-scale machinery, equipment and commodities to fit the individual requirements of the operator that ordered it (Article 29(4)(b)). The Commission’s guidance of 10 June 2026 says that an operator relying on the second exemption must show in the technical documentation that the packaging is custom-designed for an individual product. The FAQ also says the exemptions are read strictly, so check other formats you use, such as pallets and pallet wrappings. General information, not legal advice.
Checklist for buyers
- The part. Length, width and height at the widest points, including protruding parts; weight; centre of gravity; sharp edges; sensitive surfaces such as seats, threads and ports.
- Condition. Bare, painted, oiled or greased; which corrosion protection your plant already uses.
- Quantity per pack. One part per carton, several identical parts or a mixed kit; how many cartons per pallet.
- Handling. By hand, forklift or crane; stacking in the warehouse or in transport, and how high.
- Route. Parcel, pallet freight or container; storage time; humid or outdoor storage; export outside the EU.
- Marking. Part number, code, pictograms, language of the print and whether each carton needs its own data.
- Proof. A prototype and, if needed, a laboratory test: which test, and who approves the result.
- Supply. One-off order, regular orders or a seasonal peak; delivery and call-off terms.
What we can do
We design the construction with you, make samples and prototypes before a production run, and produce cartons, tube-type and telescopic cartons, XXL cartons, crates, pallet boxes and octabins, with inserts, dividers, lattices and corner protectors. Our boards are 3-layer E, B and C; 5-layer EB, BE, BC and heavy AC; and 7-layer AAC. We can arrange package tests (compression, drop, transport simulation) in a partner laboratory; terms are agreed individually. If your shipments peak before a season, we can reserve production capacity for it. The lead time is in the quote; most of our orders are delivered within 7 days (max. 16 working days). We tailor order quantities to your needs – we also make short runs and prototypes. If a construction requires a minimum quantity, we state it in the quote. Delivery within the EU is by arrangement; we already supply business customers in Lithuania, Germany, Slovakia, Czechia and the Netherlands.
Sources
Regulation (EU) 2025/40 on EUR-Lex (Article 29); Commission guidance document for the PPWR (10 June 2026); Commission FAQ on the PPWR; ISO, ISO 780: graphical symbols for handling and storage of packages; IPPC, ISPM 15. Status 13 November 2026.
What to send us
Send the part’s dimensions and weight, a photo or drawing, how it is packed and handled today, the quantity per pack and per year, the route and any print. We produce packaging to your dimensions and propose the board and construction in the quote. Send your enquiry through our home page.
Frequently asked questions
What packaging is used for agricultural machinery parts?
It depends on the part. Long shafts and axles go into tube-type or telescopic cartons with guiding inserts, knives and ploughshares into cartons with inserts and edge protection, filters, seals and small parts into cartons with dividers, hydraulic components into cartons or crates with cut-out inserts, loose parts into pallet boxes or octabins, and large assemblies into XXL cartons of up to 10 × 3 m.
Which corrugated board is right for heavy parts such as ploughshares?
Heavy and long parts usually need heavy 5-layer AC board or 7-layer AAC board, often with a stitched joint. Medium parts are often packed in 5-layer board (EB, BE or BC) and light parts in 3-layer or 5-layer board. We choose the board with you once we know the weight, the dimensions and the route.
How long can a carton for shafts and axles be?
Our tube-type cartons are long rectangular boxes with up to 240 cm inside length. For longer parts we make telescopic cartons, in which two or more parts slide over each other, for items many metres long. XXL cartons go up to 10 × 3 m.
Does a corrugated carton protect steel parts against rust?
No. Corrugated board gives no protection against corrosion and loses compression strength as it takes up moisture. For bare or machined steel parts, ask your corrosion-protection supplier about VCI film or paper or other measures. A film bag or liner made by a partner can be supplied together with the carton.
Can you state the load capacity of the carton in kilograms?
Not in advance. The result depends on the part, the construction, the inserts, the climate and the handling. We set the construction once we know the weight and dimensions and check it on a prototype; package tests in a partner laboratory can be arranged on terms agreed individually.
Do the PPWR re-use targets apply to cartons for agricultural machinery?
The re-use targets for transport packaging that start on 1 January 2030 do not apply to cardboard boxes, nor to packaging custom-designed for transporting large-scale machinery, equipment and commodities to the individual requirements of the operator that ordered it (Article 29(4) of Regulation (EU) 2025/40). This is general information, not legal advice.
Can you print part numbers and codes on the cartons?
Yes. We print flexographically and digitally, including UV. Part number, name, code and handling pictograms can be printed on the carton, and digital printing can give each carton different variable data.
Do you supply manufacturers and distributors outside Poland?
Yes. Delivery within the EU is by arrangement, and we already supply business customers in Lithuania, Germany, Slovakia, Czechia and the Netherlands. We tailor order quantities to your needs – we also make short runs and prototypes. If a construction requires a minimum quantity, we state it in the quote.